Skip to content
Browse

Edition

Sections

Appearance

AboutSourcesContactPrivacy

BDA to start elevated corridor on Ballari Road on Nov. 6; traffic to KIA to be disrupted for 18 months

The ₹2,215 crore project involves a cut-and-cover six-lane short tunnel between the Hebbal junction and Veterinary College and an elevated corridor till Mehkri Circle where they will build a rotary flyover

First reported by The Hindu 1 source
Image: The Hindu
Image: The Hindu
Read at The Hindu(opens in a new tab)

Full coverage

Every report we found on this story, oldest first. Each links to the original publisher.

  1. The Hindu

    BDA to start elevated corridor on Ballari Road on Nov. 6; traffic to KIA to be disrupted for 18 months (opens The Hindu in a new tab)

    The ₹2,215 crore project involves a cut-and-cover six-lane short tunnel between the Hebbal junction and Veterinary College and an elevated corridor till Mehkri Circle where they will build a rotary flyover

Something wrong with how we've grouped or summarised this story? Report a problem