Skip to content
Browse

Edition

Sections

Appearance

AboutSourcesContactPrivacy

HS2 Euston tunnel reaches halfway mark: 2.25 miles bored under London

The tunnelling machines were launched from Old Oak Common station earlier this year

First reported by Evening Standard 1 source
Image: Evening Standard
Image: Evening Standard
Read at Evening Standard(opens in a new tab)

Full coverage

Every report we found on this story, oldest first. Each links to the original publisher.

  1. Evening Standard

    HS2 Euston tunnel reaches halfway mark: 2.25 miles bored under London (opens Evening Standard in a new tab)

    The tunnelling machines were launched from Old Oak Common station earlier this year

Something wrong with how we've grouped or summarised this story? Report a problem