ICA: SG-JB congestion worsened by 2 lorry breakdowns on Malaysia side, not by ‘massive power outage’ at Woodlands Checkpoint as reported by Malaysian media
SINGAPORE: Singapore’s Immigration and Checkpoints Authority (ICA) has rejected reports that a major power outage at Woodlands Checkpoint caused severe congestion along the Singapore-Johor Bahru Causeway. Instead, ICA said planned electrical maintenance and two lorry breakdowns on the Malaysian side contributed to the traffic problems on Wednesday (Nov 4). The clarification followed a report by…

Read at The Independent Singapore(opens in a new tab)
Full coverage
ICA: SG-JB congestion worsened by 2 lorry breakdowns on Malaysia side, not by ‘massive power outage’ at Woodlands Checkpoint as reported by Malaysian media (opens The Independent Singapore in a new tab)
SINGAPORE: Singapore’s Immigration and Checkpoints Authority (ICA) has rejected reports that a major power outage at Woodlands Checkpoint caused severe congestion along the Singapore-Johor Bahru Causeway. Instead, ICA said planned electrical maintenance and…

