Skip to content
Browse

Edition

Sections

Appearance

AboutSourcesContactPrivacy

India’s 1st bullet train project hits milestone with Surat-Bilimora section energised

The process will now move ahead in phases, with shorter stretches being energised one at a time. The Surat-Bilimora stretch covers around 50 km between the two stations, with the tracks running along an elevated viaduct. The route crosses four rivers by means of bridges and also includes a steel bridge spanning National Highway 53.

First reported by Times of India 1 source
Image: Times of India
Image: Times of India
Read at Times of India(opens in a new tab)

Full coverage

Every report we found on this story, oldest first. Each links to the original publisher.

  1. Times of India

    India’s 1st bullet train project hits milestone with Surat-Bilimora section energised (opens Times of India in a new tab)

    The process will now move ahead in phases, with shorter stretches being energised one at a time. The Surat-Bilimora stretch covers around 50 km between the two stations, with the tracks running along an elevated viaduct. The route crosses four rivers by means…

Something wrong with how we've grouped or summarised this story? Report a problem