Skip to content
Browse

Edition

Sections

Appearance

AboutSourcesContactPrivacy

India's first bullet train targets May 2027 trials on 50-km Gujarat stretch

Vaishnaw said the high-speed rail corridor would become operational in stages, rather than being opened along its entire length at one time. Under the proposed schedule, the Ahmedabad-Vapi section is expected to be completed by the end of 2027. The bullet train service is targeted to extend to Thane by 2029.

First reported by Times of India 1 source
Image: Times of India
Image: Times of India
Read at Times of India(opens in a new tab)

Full coverage

Every report we found on this story, oldest first. Each links to the original publisher.

  1. Times of India

    India's first bullet train targets May 2027 trials on 50-km Gujarat stretch (opens Times of India in a new tab)

    Vaishnaw said the high-speed rail corridor would become operational in stages, rather than being opened along its entire length at one time. Under the proposed schedule, the Ahmedabad-Vapi section is expected to be completed by the end of 2027. The bullet…

Something wrong with how we've grouped or summarised this story? Report a problem