Skip to content
Browse

Edition

Sections

Appearance

AboutSourcesContactPrivacy

Kozhikode-Wayanad tunnel project in Keralam remains stalled despite submission of documents

Prolonged stoppage has raised concerns over safety and durability of the 110-metre stretch of tunnelling already completed in the right tube on Anakkampoyil side. KRCL and the contracting agency have reportedly warned that continued suspension could lead to deterioration of the completed work

First reported by The Hindu 1 source
Image: The Hindu
Image: The Hindu
Read at The Hindu(opens in a new tab)

Full coverage

Every report we found on this story, oldest first. Each links to the original publisher.

  1. The Hindu

    Kozhikode-Wayanad tunnel project in Keralam remains stalled despite submission of documents (opens The Hindu in a new tab)

    Prolonged stoppage has raised concerns over safety and durability of the 110-metre stretch of tunnelling already completed in the right tube on Anakkampoyil side. KRCL and the contracting agency have reportedly warned that continued suspension could lead to…

Something wrong with how we've grouped or summarised this story? Report a problem