Skip to content
Browse

Edition

Sections

Appearance

AboutSourcesContactPrivacy

Pittsburgh's 1903 rail tunnel faces permanent closure over $43m repair bill

The Wabash Tunnel, built in 1903 for the Wabash-Pittsburgh Terminal Railroad, is set to close permanently on December 1, 2026. With rehabilitation costs projected at $43 million, Pittsburgh Regional Transit has deemed repairs impractical. Once versatile, serving various transport needs, the tunnel will no longer accommodate vehicles, requiring commuters to find alternative routes as plans for its…

First reported by Times of India 1 source
Image: Times of India
Image: Times of India
Read at Times of India(opens in a new tab)

Full coverage

Every report we found on this story, oldest first. Each links to the original publisher.

  1. Times of India

    Pittsburgh's 1903 rail tunnel faces permanent closure over $43m repair bill (opens Times of India in a new tab)

    The Wabash Tunnel, built in 1903 for the Wabash-Pittsburgh Terminal Railroad, is set to close permanently on December 1, 2026. With rehabilitation costs projected at $43 million, Pittsburgh Regional Transit has deemed repairs impractical. Once versatile,…

Something wrong with how we've grouped or summarised this story? Report a problem