Skip to content
Browse

Edition

Sections

Appearance

AboutSourcesContactPrivacy

Trial runs for high-speed Surat-Bilimora train to begin in April-May 2027: Railway Minister

BEML-made train sets recently passed a critical squeeze test, says Minister; high-speed train expected to cover the 50 km stretch in just six minutes, may be open to public by next Independence Day, sources say

First reported by The Hindu 1 source
Image: The Hindu
Image: The Hindu
Read at The Hindu(opens in a new tab)

Full coverage

Every report we found on this story, oldest first. Each links to the original publisher.

  1. The Hindu

    Trial runs for high-speed Surat-Bilimora train to begin in April-May 2027: Railway Minister (opens The Hindu in a new tab)

    BEML-made train sets recently passed a critical squeeze test, says Minister; high-speed train expected to cover the 50 km stretch in just six minutes, may be open to public by next Independence Day, sources say

Something wrong with how we've grouped or summarised this story? Report a problem